Andrés Vanegas Fernández on Colombia’s C-UAS shield
On 18 November, Caracol Radio reported that the technical committee of Colombia’s National Anti-Drone Shield project recommended against buying the systems it had evaluated. None of the technologies tested, the documents say, fully met the country’s operational requirements. Recommending a purchase under those conditions, the 2022–2026 Defense sector report concluded, would have meant accepting capability gaps and transferring operational, technical, integration and sustainment risks to the State.
The committee did not declare the threat closed. It recommended formally ending the evaluation phase, keeping the operational need in force and preserving the project’s multilayer architecture. Any future acquisition, it said, should wait until requirements were formalized, funding was certain and the technology had demonstrated the required performance. The project had been framed around an investment of about 6.2 trillion pesos, with a first phase estimated at 800 billion pesos for 2026. By the end of the previous administration, that phase was still exploratory.
A separate communication from the State Contracting Directorate, also cited by Caracol, told deputy commanders of the military forces and the deputy director of the National Police that no centralized procurement process had been completed, and that a March 2026 circular on budget optimization for these systems was being set aside. The Defense Ministry may issue new guidelines for planning and acquiring counter-unmanned aircraft systems (C-UAS). Pending tasks include funding, an anti-drone bill, civil-aviation rules and physical protection, such as nets at military and police facilities. The same official report still lists, as a priority, the capacity to detect, identify and neutralize these threats.
That official triad — detect, identify, neutralize — is the point of contact with a text Andrés Vanegas Fernández signed months earlier, without reference to this committee or this budget. He has not issued a new statement on the 18 November documents. On 14 July 2026, in “Colombia frente a la amenaza de los drones”, the Colombia-born software entrepreneur and master’s graduate in national security and defense from the Escuela Superior de Guerra wrote: “Colombia needs a national strategy for the protection of low-altitude airspace that integrates capabilities to detect, identify, monitor and neutralize hostile drones.”
He also wrote that technology alone would not close the gap. “The solution is not exclusively technological. It also requires doctrine, training, intelligence and a permanent updating of institutional capabilities.” And he pointed to a mismatch of speed: “While the State advances constrained by administrative procedures, budgets and procurement cycles, armed groups operate with an agility that is hard to anticipate and even harder to match.” The committee’s decision to wait for formal requirements and proven performance is a procurement fact, not a comment of his. It does, however, sit next to the lag he had already described.
Reporting by El País on 15 November helps explain why a single purchase is a poor substitute for a multilayer shield. Fiber-optic drones do not emit the radio signal that a jammer is designed to block; in February 2026, an anti-drone system at the San Jorge base in Saravena failed against that technique. Vanegas had already warned that illegal groups “innovate and turn civilian technology into a tool of war,” and that the threat “demands a model of continuous innovation, able to anticipate — not only to respond — to changes in the operational environment.”
In Colombia, jamming and related neutralization tools are also a legal matter for state security agencies, not a civilian free-for-all. The operational need the committee left standing is, in that sense, a state task: a strategy, as Vanegas put it, not a reaction after each new attack. “The question is no longer whether Colombia will face a war with drones. That stage is behind us.” The documents published this week do not answer whether the gap will close. They do confirm that the need, and the multilayer architecture, remain on the table.








